Past and Current Job References

Being a company specializing in services of Port equipment, CGS main objective is providing quality and timely completion of works to the satisfaction of our clients and continuously improve our quality of services.

Some of the major works and jobs undertaken by CGS in the field of Retrofit, Technical Services & Maintenance are as follow:

MAINTENANCE SERVICE CONTRACTS
Customer Year Scope of Supply Type of Cranes Personnel
...being updated ...being updated
  • ...being updated
...being updated ...being updated
Port of Tanjung Pelepas
MALAYSIA
August 2009
to
August 2013

 

Maintenance of Rubber Tyred Gantry Crane (RTG)
  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
71 RTG 50
(Malaysian)
Jakarta International Container Terminal
JAKARTA, INDONESIA
May 2008
to
April 2011

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
  • Troubleshooting
9 RTG 20
(Indonesian)
Jakarta International Container Terminal
JAKARTA, INDONESIA
May 2008
to
April 2011

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
  • Troubleshooting
6RTG 12
(Indonesian)
Jakarta International Container Terminal
JAKARTA, INDONESIA
April 2008
to
October 2008

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
  • Troubleshooting
7 RTG 12
(Indonesian)
PT. Hutchison Port
JAKARTA, INDONESIA
January 2008
to
December 2008

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
  • Troubleshooting
2 QC 10
(Indonesian)
Bintulu Port
EAST
MALAYSIA
May 2006

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
2 IMPSA QC 2
(Malaysian)
Jakarta International Container Terminal
JAKARTA, INDONESIA
2004

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
9 ZPMC RTG 25
(Indonesian)
Jakarta International Container Terminal
JAKARTA, INDONESIA
2004

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
  • Crane Opeartions
1 IHI Container Crane 10
(Indonesian)
Port of Tanjung Pelepas
MALAYSIA
July 2004

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
15 IMPSA RTG 50
(Malaysian)
Port of Tanjung Pelepas
MALAYSIA
July 2004

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
17 IMPSA QC 50
(Malaysian)
Terminal Petikemas Surabaya
SURABAYA, INDONESIA
2001
to
2003

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
2 Post-Panamax
Container Handling Cranes
3
(Indonesian)
Kaohsiung Port
TAIWAN
1999
to
2001

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
3 Super Post-Panamax
Container Handling Cranes
2 + 6
(Malaysian + Taiwanese)
Johor Port Bhd
MALAYSIA
1998
to
2002

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
2 Post-Panamax
Container Handling Cranes
 6
(Malaysian)
Merak Port
INDONESIA
1998
to
2000

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
2 Panamax
Container Handling
QC
4
(Indonesian)
Kuantan Port Consortium
MALAYSIA
1997
to
2002

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
1 Panamax
Container Handling
QC
 6
(Malaysian)
Johor Port Bhd
MALAYSIA
1997
to
2002

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
1 Level-Luffing
Multipurpose Cargo Handling Crane
 3
(Malaysian)
Kuantan Port Consortium
MALAYSIA
1996
to
2002

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
1 Level-Luffing
Multipurpose Cargo Handling Crane
 5
(Malaysian)
Johor Port Bhd
MALAYSIA
1997
to
2002

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
1 Post-Panamax
Container Handling
Crane
 6
(Malaysian)
Klang Port Management
MALAYSIA
1995
to
1997

 

  • Supervision
1 Post-Panamax
Container Handling
Crane
 4
(Malaysian)
Kuantan Port Authority
MALAYSIA
1993
to
2002

 

  • Preventive Maintenance
  • Corrective Maintenance
  • Standby Maintenance
1 Panamax
Container Handling
OC
 5
(Malaysian)
 

RETROFIT SERVICES
Customer Year Scope of Supply Type of Cranes Type of Services
...being updated ...being updated
  • ...being updated
...being updated ...being updated
Port of Tanjung Pelepas
MALAYSIA
September 2014
  • Refurbishment of IMPSA RTG including of Supply
RTG 25
(Malaysian)
Schneider
MALAYSIA
September 2010
  • Westport Unloader Crane No.1 Retrofit
1 Unloader Crane Crane Retrofit
Malayan Flour Mills Berhad
MALAYSIA
November 2009

 

  • Disassembly of Existing Ship Unloader & Assembly of the newly Fabricated Portal Frame Extension, Installation New Vertical Bucket Elevator, Reinstallation Existing Dismantled Horizontal Boom, Joint, Hoppers, Pipe Spouting, New Conveyors and other associated works
Ship Unloader Height Increase
Northport, Port Klang
MALAYSIA
August 2008

 

  • Repair Works on Portal Beam & Re-Torque All Structural Bolts on Quay Crane
Quay Crane Re-Torque
South Asia Gateway Terminal (SAGT)
COLOMBO, SRI LANKA
November 2007

 

  • Testing & Delivery of Trolley Wheels, Catenary Wheel Assembly & Accessories

IMPSA Quay Cranes

Crane Retrofit
Kuantan Port Consortium
MALAYSIA
January 2007

 

  • Complete Replacement of PLC and Drive
  • Change of Fibre Optic Cable
  • Complete Cleaning and Painting of Crane

1 MGM Crane
&

1 Samsung RTG

Crane and RTG Retrofit
South Asia Gateway Terminal (SAGT)
COLOMBO, SRI LANKA
January 2007

 

  • Leg Damage Repair Job due to accident
1 IMPSA Quay Cranes Crane Retrofit
Bintulu Port
EAST
MALAYSIA
January 2007

 

  • Design and Supply New Hydraulic TLS system
  • Change of TLS system from electronic to hydraulics system Replacement
2 IMPSA RTG RTG Retrofit
Northport, Port Klang
MALAYSIA
February 2006

 

  • Carried out  structural inspection
  • Bolts & Nuts replacement
8 IMPSA RTG Crane Retrofit
Port of Tanjung Pelepas
MALAYSIA
January 2006

 

  • Leg Damage Repair Job due to accident
1 STS Crane Repair work on 1 crane
South Asia Gateway Terminal (SAGT)
COLOMBO, SRI LANKA
January 2006

 

  • Leg Damage Repair Job due to accident
1 IMPSA Quay Cranes Crane Retrofit
Westport Malaysia
MALAYSIA
November 2005

 

  • Supply & Install trolley Motors
  • Supply & Install Anti-Collision Device
  • Supply & Install Trolley Wheels
9 STS Crane Retrofit on 9 cranes
Northport, Port Klang
MALAYSIA
January 2005

 

  • Change main stairs to step ladders
  • Change of Trolley Rail & Alignment
  • Laying of Fiber Optic Cable
2 STS Crane Retrofit works on 2 Hyundai Cranes
Kuantan Port Consortium
MALAYSIA
January 2005

 

  • Engineering and Works Carried Out to Replace 3.5mtrs diameter Main Slewing Bearing on Level Luffing Crane
1 Level Luffing Crane Slewing bearing Change
on Level Luffing Crane
KOJA
JAKARTA, INDONESIA
November 2004

 

  • Load Cell Installation for 8 units of Sumitomo RTG at KOJA/HPH Jakarta
8 RTG Crane Crane Retrofit
Northport, Port Klang
MALAYSIA
August 2004

 

  • Engineering and Survey on Crane Rail and Trolley Wheel Alignment on 5 IMPSA Crane and 3 Mitsubishi Crane
8 STS Crane Crane Retrofit
Asiaport / Westport
MALAYSIA
April 2004

 

  • Engineering, Supply, Install and Commission Trim List and Skew (TLS) System on IMPSA  cranes
5 + 4 STS Crane Crane Retrofit
Siyanco/ Jeddah Islamic Port
JEDDAH, SAUDI ARABIA
January 2004

 

  • Engineering, Supply, Install and Commission PLC and Drivel System Upgrade on IMPSA cranes
2 STS Crane Crane Retrofit
Westport Malaysia
MALAYSIA
September 2003

 

  • Engineering, Supply, Install and Commission Load Cell System on IMPSA crane-CC1
1 STS Crane Crane Retrofit
Westport Malaysia
MALAYSIA
July 2003

 

  • Engineering, Supply, Install and Commission Spohn and Bukard Joystick on IMPSA Unloader cranes
2 STS Crane Crane Retrofit
Penang Port
MALAYSIA
Jun 2003

 

  • Repair Cracked Hoist Drum of MHI Gantry crane
1 STS Crane Crane Retrofit
Northport, Port Klang
MALAYSIA
April 2003

 

  • Change main Hoist Motors, PLC Upgrading, Constant Power, Convert hydraulic TLS to Screw Jack TLS ,Extend back reach washing platform
  • Modify vertical ladder to step ladder, Festoon Cable replacement, Change Load Cell
  • Replace boom latch hydraulic thruster, To install centralized lubrication system
  • Repair hoist gearbox
  • Install main Hoist Emergency system
  • Re-torque all super structure bolts
7 STS Crane Crane Retrofit
Pelabuhan Tanjung Pelepas (PTP)
MALAYSIA
September 2002

 

  • Repair of fire damage in machinery house of crane 7. Including structural, mechanical and electrical works
  • Complete supply of New Control Room and Control System. Installation and Commissioning
1 STS Crane Control System
Westport Malaysia
MALAYSIA
June 2002

 

  • Replacement of main Hoist Motors-9QC
  • Load cell Replacement- 8QC
  • Trolley Wheel replacement
  • Inspection, Replacement and re-torque of Structural bolts- 9QC
1 STS Crane

Hoist Motor Load cell Re-torque of Superstructure Bolts and Nuts

 

TECHNICAL SERVICES
Customer Year Scope of Supply Type of Cranes Type of Services
...being updated ...being updated
  • ...being updated
...being updated ...being updated
Port of Tanjung Pelepas
MALAYSIA
April 2015
  • Rail Pad Replacement and Rail Alignment Works
RTG 25
(Malaysian)
Malayan Flour Mills Berhad
MALAYSIA
November 2010
  • Replacement of Bearings, Bushings and Bubenzer Brake System at Top Mast & Boom Girder Including NDT and Structural Survey Works for Unloader Crane
1 Ship Unloader Technical Services
Northport, Port Klang
MALAYSIA
June 2010

 

  • To Service and Calibrate Load Weighing System with Software modification
5 Quay Crane Technical Services
South Asia Gateway Terminal (SAGT)
COLOMBO, SRI LANKA
April 2010

 

  • Provide Two (2) engineers to carry out Trolley Rail Alignment works
IMPSA Quay Crane Technical Assistance
Kuantan Port Consortium
MALAYSIA
November to December 2009

 

  • Supply Manpower and Spare Parts to Carry Out Troubleshooting and Repair of Crane

2 Quay Cranes

Troubleshooting
Kuantan Port Consortium
MALAYSIA
July 2009

 

  • Carried Out Mechanical & Electrical Survey & functionality
  • Carried out Thermography and Vibration Analysis Tests
  • Carryout Finite Element Analysis and Submit Report
  • Recommended on the repair works

1 Level Luffing Crane

Structural, Inspection for LLC Crane
Penang Port
MALAYSIA
June 2009

 

  • Troubleshooting of Electrical Switchgears
1 IMPSA Quay Cranes Technical Assistance
Northport, Port Klang
MALAYSIA
May 2009

 

  • To Repair Crane Monitoring System Unit Faulty
1 Quay Cranes Technical Services
Yang Ming Line Terminal
TAIWAN
May 2009

 

  • Consultation & Supervision for Checking Impsa Crane Accident with Vessel
1 IMPSA Quay Cranes Technical Assistance
South Asia Gateway Terminal (SAGT)
COLOMBO, SRI LANKA
April 2009

 

  • Provide Two (2) engineers to carry out boom hinge replacement works / Trolley Rail Alignment works
1 IMPSA Quay Cranes Technical Assistance
Northport, Port Klang
MALAYSIA
Feb 2009

 

  • Repaired CCM Port of CMS for QC29
1 Quay Cranes Technical Services
Northport, Port Klang
MALAYSIA
January 2009

 

  • Consultation for Checking Impsa Crane Accident with Vessel
1 Quay Cranes Technical Services
Westport Malaysia
MALAYSIA
December 2008

 

  • To Check & Recover the CMS in QC03 & QC04
2 Quay Cranes Technical Services
Northport, Port Klang
MALAYSIA
December 2008

 

  • Repair & Rectify CMS Communication Fault
1 Quay Cranes Technical Services
Bintulu Port
EAST
MALAYSIA
December 2008

 

  • To Provide two (2) Engineers to assist and do troubleshooting assistance works on breakdown occurrence
1 IMPSA Quay Cranes Troubleshooting
Northport, Port Klang
MALAYSIA
November 2008

 

  • Carry Out Trouble shooting & Repair of Drive at QC025
1 Quay Cranes Technical Services
Bintulu Port
EAST
MALAYSIA
November 2008

 

  • To rectify & load the PLC program and supply PLC back- up batteries for BPSB/RTG/05
1 RTG Technical Assistance
Bintulu Port
EAST
MALAYSIA
October 2008

 

  • To remove existing Trolley Wheels & Install (4) Four new units of Trolley Wheel & to Perform Alignment Task on Caternary Trolley for QC01
1 Quay Crane Technical Services
Yang Ming Line Terminal
TAIWAN
August 2008

 

  • Supplied Expertise for inspection due to crane accident
1 IMPSA Quay Crane Technical Assistance
Bintulu Port
EAST
MALAYSIA
July 2008

 

  • To Provide specialist Services to BPSB Container Crane Equipment
1 Quay Crane Specialist Services
Bintulu Port
EAST
MALAYSIA
May 2008

 

  • To troubleshoot / fault finding tripping of H-V Side / L-V Side (Auxiliary MCB) of Main Transformer, to start-up Drive / PLC and Minor Commissioning after turning on Main Power Supply (Incoming)
1 Quay Crane Troubleshooting
Kuantan Port Consortium
MALAYSIA
May 2007

 

  • Carried Out Mechanical & Electrical Survey & functionality
  • Carried out Thermography and Vibration Analysis Tests
  • Carryout Finite Element Analysis and Submit Report
  • Recommended on the repair works

2 HITACHI Quay Cranes

Structural, Mechanical System, Electrical System and Control System Survey Works
Kuantan Port Consortium
MALAYSIA
January 2007

 

  • Complete Replacement of PLC and Drive
  • Change of Fiber Optic Cable
  • Complete Cleaning and Painting of Crane

1 MGM Crane and 1 Samsung RTG

Crane and RTG Retrofit
Yang Ming Line Terminal
TAIWAN
August 2006

 

  • Supplied Expertise to supervise the repair consultation due to accident
2 IMPSA Quay Crane Technical Assistance
Bintulu Port
EAST
MALAYSIA
May 2006

 

  • Carried Out Mechanical & Electrical Survey & functionality
  • Carried out Thermography and Vibration Analysis Tests
  • Carryout Finite Element Analysis and Submit Report
  • Recommended on the repair works
2 IMPSA Quay Crane Technical Assistance
Comasco Jeddah Port
JEDDAH, SAUDI ARABIA
March 2006

 

  • Carried out control system troubleshooting
1 IMPSA Quay Crane Technical Assistance
Penang Port
MALAYSIA
Feb 2006

 

  • Drive troubleshooting
1 IMPSA Quay Crane Technical Assistance
Penang Port
MALAYSIA
December 2005

 

  • Carried Out Mechanical & Electrical Survey & functionality
  • Carried out Thermography and Vibration Analysis Tests
  • Carryout Finite Element Analysis and Submit Report
  • Recommended on the repair works

3 STS GEC Crane

+

16 RTGs

(Morris, Samsung and Hitachi)

Mechanical & Electrical Survey of 3 QCs & 16 RTGs
Pelabuhan Tanjung Pelepas (PTP)
MALAYSIA
February 2005

 

  • Boom Latch Modification (Mechanical & PLC)
2 IMPSA Quay Crane Retrofit
Westport Malaysia
MALAYSIA
October 2004

 

  • PLC Drive Training for KMT Engineers for 4 days
IMPSA Crane Training
Terminal Petikemas
SURABAYA, INDONESIA
October 2004

 

  • Technical Assistance to solve CC#6 PLC and Drive loading work
2 Post- Panamax
Container Handling Cranes
Technical Assistance
Kuantan Port Consortium
MALAYSIA
February 2004

 

  • CC1 & LLC PLC Upgrade

1 IMPSA Crane & 1 LLC

Crane Retrofit
Siyanco/ Jeddah Islamic Port
JEDDAH, SAUDI ARABIA
January 2004

 

  • Engineering, Supply, Install and Commission PLC and Drivel System Upgrade on IMPSA cranes
2 STS Crane Crane Retrofit